Working with Savroc
One project, from your drawings to production in your plant.
Savroc owns and licenses TripleHard® and runs your project from the first simulation of your parts to stable production in your plant. Your line is built new by a qualified equipment partner or converted from the line you have.
What working with Savroc looks like
Six phases. Savroc in every one.
What happens, what you get, and what you decide.
Phase 1 of 6
Targets and starting point
Tell us about your parts, the specifications they must meet, your volumes and how you coat them today. We go through it with your engineers, in Kuopio or online.
- You get
- A shared target memo and a project plan.
- You decide
- Go on to simulation.
Phase 2 of 6
Simulation for your parts
TripleHard® is already tested and in industrial use, so we start from your drawings, not from coating trials. We model how the coating builds on your parts and the capacity your volumes need.
- You get
- A simulation report for your parts.
- You decide
- Go on to design.
Phase 3 of 6
Design and targets
We design the new line, or the conversion of your existing one, with you. The targets your parts must meet are agreed in writing before anything is built.
- You get
- A line concept or conversion plan, a capacity calculation and written acceptance criteria.
- You decide
- The investment and the TripleHard® licence. For a new line, Savroc specifies the equipment, and you sign the equipment contract with a qualified equipment partner, which builds the line under Savroc's project lead.
Phase 4 of 6
Build or convert
A new line is built by a qualified equipment partner to Savroc's process design, under Savroc's project lead. An existing line is converted to Savroc's conversion plan under Savroc's guidance, by the customer's own team or a qualified equipment partner.
- You get
- The line, ready for commissioning.
Phase 5 of 6
Commissioning in your plant
Our process engineers commission the process in your plant, train your operators and run it with you until it meets the agreed targets.
- You get
- The qualification documentation.
Phase 6 of 6
Production and support
The licence keeps us with you: process support, optimisation and troubleshooting, and Savroc's online monitoring software, continuously developed.
- You get
- Stable production, and a partner who stays.
All phases
- 1Targets and starting pointA shared target memo and a project plan.
- 2Simulation for your partsA simulation report for your parts.
- 3Design and targetsA line concept or conversion plan, a capacity calculation and written acceptance criteria.
- 4Build or convertThe line, ready for commissioning.
- 5Commissioning in your plantThe qualification documentation.
- 6Production and supportStable production, and a partner who stays.
Shared responsibility: how do we know it worked?
- Targets in writing. The targets your parts must meet are agreed in writing before the line is built or converted.
- Run until they are met. Our process engineers commission the process in your plant and stay until it runs to those targets.
- Data at every decision. Every phase ends with data you can take to your management. You decide whether to continue.
Who does what
Who does what in a TripleHard® project?
| Phase | You | Savroc |
|---|---|---|
| Targets and starting point | Parts, specifications, volumes, today's process | Reviews them with your engineers, proposes the plan |
| Simulation | Drawings | Models the coating on your parts |
| Design and targets | Plant data, the targets with us, the investment decision | Line concept or conversion plan, equipment specification, written acceptance criteria |
| Build or convert | The site, or your line for conversion | Equipment specification; project lead over the equipment partner's build; inspections; guidance of a conversion |
| Commissioning | Operators, your own OEM qualification | Commissions the process on site, trains, runs it to the targets |
| Production | Runs production | Process support, optimisation, online monitoring software |
Two routes
A new line, or your existing line converted.

New line
A complete new line, built by a qualified equipment partner to Savroc's process design. Pictured: the reference line in Kuopio.
Phase 4, build: the equipment partner builds the line under Savroc's project lead.
The two routes on the technology pageThe reference line in Kuopio
Line designed and built by ILMAR

Your line, converted
A TripleHard® Cr(III) bath replaces the Cr(VI) bath; a nickel bath is added if the line has none. With many times less chromium in the bath, the ventilation and wastewater treatment are much smaller.
Current Engine valves: tested on valve stems and offered for licensed production. Shock absorber rods: tested; Savroc has designed a coating cell. Both run in open tanks or a cell of their own, not on the continuous line; volume production is possible there but has not started yet.
Phase 4, convert: to Savroc's conversion plan under Savroc's guidance, by your own team or a qualified equipment partner.
Only phase 4, build or convert, differs between the routes. Each customer application is engineered from your drawings and verified during commissioning.
For everyone who signs off
Making the case inside your company.
Short answers for every desk that has to say yes. The data behind them comes with the project.
-
Purchasing
What does it cost, and who supplies it?
Licence, process know-how and support from Savroc; the line from a qualified equipment partner, or your own line converted. Costs are set before you invest.
-
Health, safety and environment
What changes for our people?
A Cr(III) process replaces the Cr(VI) chemistry your people handle today. The continuous line is fully enclosed.
-
Management
Timeline, investment, risk.
Every phase ends in a decision, so the first commitment is small. TripleHard® is in industrial use at a licensed coater, with coated rods supplied to Hydroline. The proposed EU Cr(VI) restriction is moving through ECHA.
What you sign, and with whom
Agreements for your project.
Savroc agreement with Savroc
-
TripleHard® process licence
The right to run TripleHard® in your own plant, per plant and territory
-
Online monitoring software
Included in every line licence; in partial use on the reference line in Kuopio.
Included
-
Engineering, commissioning and support
Simulation, design, commissioning in your plant, process support in production

Equipment partner
-
Continuous production line
A new line, built by a qualified equipment partner to Savroc's process design. A conversion can be done by your own team
Roadmap: what TripleHard® replaces, and when
- Now: replacing nickel + Cr(VI) duplex coatings. TripleHard® replaces the nickel-plus-hexavalent-chrome stack on hydraulic cylinder rods and engine valves, both now, not one after the other, in manufacturers' own plants: rods in industrial use, valves tested and offered for licensed production.
- Shock absorber rods: the third application, on a converted existing line or in a coating cell designed by Savroc, not on the continuous line. Volume production is possible there; it has not started yet.
- From 2028: replacing Cr(VI) hard chrome. We replace Cr(VI) hard chrome across applications as fast as lines can be built and converted.
- Why we start here. TripleHard® starts where it replaces nickel plus hexavalent chromium, which is where the technology is proven and where customers are ready now; from there we scale the same technology to more applications and plants. As more lines are built, TripleHard® becomes more accessible and more cost-effective for more applications.
- Direction: licensed TripleHard® production in the world's major industrial markets.
Milestones: the continuous line.
-
Reference line
The industrial-scale continuous TripleHard® line is running in Kuopio and open for visits. Version 1 is complete: the first-round run parameters are locked.
-
Plan: mass production on the first continuous customer line, built by a qualified equipment partner, with the process commissioned by Savroc.
Online monitoring software: the same quality on every licensed line.
Included in every line licence, in partial use on the reference line in Kuopio and continuously developed.
- Real-time process tracking.
- Deviation alarms.
- A record for every part.
Who you work with
You work with the people who developed TripleHard®.
The Savroc team in Kuopio runs every project: the inventors of the coating, surface engineers with decades of plating experience, the laboratory team behind every test result on this site, and the engineers who design the lines and the online monitoring software.
Meet the teamQuestions about working with Savroc
What do we need to start?
Your part drawings or a diameter and length range, the specifications the parts must meet, the target annual volume and coating thickness, and how you coat them today. For a new line, also the plant: floor area and height, power, water and ventilation.
Do you coat our parts to test the coating?
Normally not. TripleHard® is already tested and in industrial use, so a project starts from the simulation of your parts, which can be done from drawings. Coating samples is possible on special request.
What does our own team do in the project?
Your engineers set the targets with us and make the decision at the end of each phase. Your plant provides the space, the utilities and the operators we train, and your quality team runs your own OEM qualification with our data.
How long does a project take?
The two routes differ. Converting an existing line is the shorter route; the time to stable series production depends on the line, the part families and the validation your customers require. A new continuous line is a capital project with a lead time set by its engineering and manufacture, agreed in the design phase. In both cases your own OEM qualification usually runs longer than the installation, and we support it with data throughout.
Can an existing line be licensed instead of buying a new one?
Yes. Hydraulic cylinder rods are in industrial use on a converted open-tank line today. For high-volume rod production the continuous line is the route: one enclosed pass, built for around-the-clock production under online monitoring. Engine valves, shock absorber rods and other open-tank work run on an existing line, converted.
Where can TripleHard® be licensed?
The model is designed to scale worldwide: licences are agreed per customer, plant and territory, with lines from qualified equipment partners and the engineering from Savroc.